Access Report September 2016

On Friday 19th August, I attended a meeting organized by Parks Victoria Halls Gap. I was invited to represent the climbing community and attended with a number of other user group reps. The North Grampians Community Workshop was an opportunity to discuss openly and workshop, possible ideas on future developments in the North Grampians area of the park. Topics would include:


· Grampians Peaks Trail – Opportunities, alignments, camping on offer and planning requirements

· Fire Recovery – campground upgrades, rock climbing, four wheel drive and bush walking experiences

· Day use sites, picnic areas and trailheads – including Coppermine and Golton Gorge area discussions.


So the main topic that came up that would primarily interest climbers was camping and campgrounds. And indeed, from many of the other user groups, this seemed to be a big issue. With the extra visitation expected from the Grampians Peaks Trails as well as just general growth in user groups, having enough camping spots to suit all could forseeably be a problem. Be it individual sites, vehicle based sites, bush camping etc and not to mention one of the biggest issues with this – toilet or waste disposal.


TROOPERS CREEK CAMPGROUND


Troopers Creek Campground which is the campground that climbers tend to use if they are climbing at Mt Difficult for the weekend is slated for permanent closure with the GPT being the impetus for this. I have had discussions with the PV team on this a number of times. Amongst a variety of concerns, the campground as it is currently, is a small one that will not be able to cater for the extra people that the trail brings through.


It also has some cultural heritage sensitivities close by which add further issues. I explained my concerns re the closure in original discussions on this in an advisory group meeting a while ago. The new campground further up the road, although much larger, would add another 45 minutes on top of the 45 mins it already takes to walk up the track.


As I explained, this campground is used by climbers and Mt Difficult is historically an important cliff. After some discussion, I have been assured that climbers will be able to park near the old Troopers and still walk the track up to Mt Difficult as they did before. This track though has been extensively damaged by the fire and won’t be repaired. Whilst I have not had the opportunity to check out the track, climbers in general are not adverse to walking tracks that aren’t maintained. It might be an idea at some point in the future though, to head in and check that the alignment is clear enough for people to find their way to cliffside. The new campground will have more tent sites and group camping areas and some vehicle based camping as well as toilet and fireplace facilities.


Bush camping in the area will also still be available.


STAPYLTON CAMPGROUND


Stapylton Campground is due to open just before the September school holidays. Opening has been held up by the slow supply and delivery of the timber used in the remaining works in the campground. Stapylton was always seen as a group camping site and the new improved one will be no different in that regard. Group camping will have even more of a focus although with some separated communal areas rather than the one main one that was there before. Vehicle based camping will also be catered for.


GOLTON GORGE BUSH CAMPING


This campsite will continue to be available as a bush camping site.


CAMP SANDY AND BUSH CAMPING


Due to Stapylton Campground being closed, a number of bush campsites have been developed and have grown in size. Camp Sandy in particular has been seen and noted by a number of other user groups and park locals.


Feedback ranges from just interest to concern. Once Stapylton re-opens, there is a strong feeling that this particular bush camp will be closed down.


BOOKING SYSTEM AND FEES


Following on from this, discussion was then had around the fact that for many the booking system and fee structure doesn’t work for them and the possibility that bush camping will continue to grow be it for financial reasons or the simple requirements that some have in regard to camping.


As was noted, the booking and fee system is not a PV strategy and wasn’t actually on the table to discuss at this meeting. This is a State government system. Still, it was an important thing to note, for PV to understand some of the continuing issues and thoughts of visitors to the park. Of note: State government is currently looking at the booking system of the parks so Watch this space!


Space doesn’t permit me to highlight every point discussed at the meeting but other topics did include Bouldering and its sudden growth and what that might mean for the park. The other user groups had the opportunity to learn a little more about it although personally, I think that there is probably room for some more education in this department.


All in all, the workshop was a good opportunity to hear other stakeholders interests and concerns in the park and what their suggestions might be for moving forward. Thanks must go to the Halls Gap Parks Victoria team for continuing to involve the community in discussions around forward planning.


It is not an easy process to balance budget and resources with the needs and wants of the many diverse users. I look forward to discussing further many of the topics we broached.